Influential Article Review - Profit-driven Scheme For Limited-Resource Projects With Adjustable Capacity Limits

Authors

  • Kofi Hinton
  • Shola Potter
  • Connah Kumar

Keywords:

Project scheduling, Encodings, Heuristics, Local-search, Genetic algorithm

Abstract

This paper examines operations. We present insights from a highly influential paper. Here are the highlights from this paper: We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity constraints can often be systematically modified by temporarily assigning costly additional production resources or using overtime. We, furthermore, assume that the revenue of the project decreases as its makespan increases and try to find a schedule with a profit-maximizing makespan. Like the RCPSP, the problem is NP-hard, but unlike the RCPSP, it turns out that an optimal schedule does not have to be among the set of so-called active schedules. Scheduling such a project is a formidable task, both from a practical and a theoretical perspective. We develop, describe, and evaluate alternative solution encodings and schedule decoding mechanisms to solve this problem within a genetic algorithm framework and we compare the solutions obtained to both optimal reference values and the results of a commercial local search solver called LocalSolver. For our overseas readers, we then present the insights from this paper in Spanish, French, Portuguese, and German.

Downloads

Published

2019-12-14

How to Cite

Hinton, K., Potter, S., & Kumar, C. (2019). Influential Article Review - Profit-driven Scheme For Limited-Resource Projects With Adjustable Capacity Limits. American Journal of Management, 19(6). Retrieved from https://mail.articlegateway.com/index.php/AJM/article/view/3495

Issue

Section

Articles